The Indian Space Research Organisation (ISRO) is aiming to conduct the first operational launch of its Small Satellite Launch Vehicle (SSLV) in December, a senior official confirmed. The agency needs two successful development missions before a launcher is declared operational. It has carried out three development flights so far — the first, on August 7, 2022, fell short of placing satellites in the intended orbit, while the second and third, in February 2023 and August 2024, were declared successful.
ISRO chairman V Narayanan indicated that another PSLV launch with a modified third stage may also take place soon. "We have already conducted one ground test and will be ready to launch the PSLV after another ground test," he said on the sidelines of the India International Space Conclave. The changes follow the failures of PSLV C-61 in May 2025 and PSLV-C62 in January 2026, which ISRO said occurred due to different anomalies in the third and uppermost stage. The third-stage configuration was revisited, with changes made to design margins, raw material acceptance criteria, assembly procedures and quality checks, and the nozzle configuration was improved.
The launch of the privately built PSLV-N1 may have to wait until after ISRO's own PSLV, according to reports on Monday. Narayanan said on Tuesday that the industry-built PSLV will be launched in the first quarter of 2027.
Against a planned 17 launches for FY 2026-27, including at least four PSLV and five SSLV missions as per ISRO's annual report, the agency achieved only three launches this year, including the failed PSLV-C62. It launched the earth observation satellite EOS-5 in September and the navigation satellite NVS-03 in October, bringing the country's navigation system back online.
